Checking calendar imports

Verify the event count, duration, display zone, and dates around a clock change before relying on a newly imported calendar file.

Know which export you downloaded

A single-meeting ICS contains one reviewed event. A recurring export contains the resolved occurrences in the twelve-date preview as separate events. Explicitly skipped occurrences reduce that count. The file does not create an unlimited series, connect to an account, or invite attendees.

Use a small, concrete check

Start with the expected number of events and a known example. For 27 October 2026, the New York 09:00–10:30 meeting corresponds to 13:00–14:30 UTC, 13:00–14:30 London, and 14:00–15:30 Berlin. All of these rows describe the same ninety-minute event.

Open the imported event and compare its date, duration, and display zone. A calendar configured for Sydney will show 00:00–01:30 on 28 October for that example. A different local hour or date can therefore be correct. Check the instant and zone context before changing the imported time.

Inspect both sides of a clock change

For the New York-anchored Tuesday series, compare 27 October and 3 November 2026. New York stays at 09:00; London changes from 13:00 to 14:00. If both imported London events show the same hour, investigate the selected anchor and the file you imported.

If a repeated local time was involved, compare the chosen numeric offset. New York’s earlier 01:30 on 1 November corresponds to 05:30 UTC, while the later one corresponds to 06:30 UTC. The wall-clock text alone cannot distinguish the two imports.

Be careful with a second import

Calendar applications differ in how they handle an event that appears again. Some may recognize an identifier, while others may create a duplicate or offer a choice. Inspect the destination calendar before importing an updated file. Remove or replace old entries using that application’s own controls; HourBraid does not reach into earlier imports.

Keep the file and the editable plan

An ICS file is useful evidence of what was exported. A project JSON file preserves the planner settings that produced it. Keep both when a schedule matters. If an import fails, retain the original error message, calendar application name, selected cities, date, and data version, while leaving private meeting notes out of any report.

Sources

Follow the original references for the rules and formats used in this guide.